


Updated TTS Traffic Info:
- We were just informed that there is an Ice Barge that will be traveling along the Buffalo River numerous times on Saturday resulting in the Main Bridge (which is the main access point to Riverworks) going up and down, resulting in even longer traffic delays.
- The bridge on the Ohio Street/Ganson side is also closed for construction
- We recommend the following:
UBERING/TAXI: Get Dropped off at the Seneca Niagara Casino (huge parking lot, easy to get dropped off/Picked up at) and walk the 2 blocks over Main Bridge to Riverworks. If you see the bridge is up, stop into Ballyhoo or Swannie House for a quick drink and support Local! Good news if walking is its supposed to be 60 degrees on Saturday!
Driving Yourself: Come to Riverworks the back way, come in off of Route 5/Skyway – get off at Ohio Street and make a left onto Ganson Street. This way you avoid the Main Bridge going up + down.
Map for reference.
